Even before CDI was incorporated, its founders were developing
breakthrough technologies that have now become industry
standards. CDI has always been an industry pioneer that
has generated numerous innovations.
|
| Year |
Innovation |
| 1998 |
Los Pelambres project, world's largest
downhill conveyor system (3 conveyors, 12.7 km, 1296
m drop, 8700 tph) [link] |
| 1998 |
Development of SAG,
AG and ball mill modeling program (particle dynamics
modeling) [ Sold to Metso Minerals ] |
| 1996 |
Zisco project, world's longest single
flight horizontal curve conveyor (15.6 km) [link] |
| 1995 |
Development 32 bit
CPU based drive/brake controller |
| 1994 |
Development of granular flow for chute
analysis [link] |
| 1993 |
Development of Mine
Simulation Program |
| 1992 |
Morenci project [link] |
| 1992 |
Design of DAQ-1 Data
Acquisition System |
| 1991 |
Development of new splice patterns 2,
3, 4 and 5 step optimization [link] |
| 1991 |
Design of UPS-1 Module
& DEFT-2 |
| 1991 |
Development of PSTRESS 3, (FEA) [link] |
| 1990 |
First belt splice
study using FEA |
| 1990 |
Development of BELTSTAT [link], rubber rheological
model |
| 1990 |
Quadrature encoder
noise filter with fastest, most accurate analog-digital
regulation |
| 1989 |
Design of DEFT-1 Tachometer |
| 1989 |
World's first look-ahead
preemptive start/stop control - Waihi Gold, New Zealand |
| 1988/9 |
First curved conveyor - 20.5 km overland
with longest horizontal curve arc at 5 km - Channar,
Australia [link] |
| 1987 |
Predicted pulley failures
(1987-1993) - Kennecott, Bingham Canyon, USA [link]
- Quintette, B.C., Canada [link]- Kennecott, Chino, USA
- Syncrude, Alberta, Canada |
| 1987 |
World's strongest belt splice strength
rating (ST-3300N/mm) up to 1996 - Palabora, RSA [link] |
| 1987 |
First mine-wide PLC
System with Graphics - Palabora, RSA [link] |
| 1986 |
First proportional brake control of
head and tail drives - Kennecott, Bingham Canyon,
USA [link] |
| 1986 |
Palabora project [link] |
| 1984 |
PCURV horizontal curve engineering code |
| 1983 |
PSTRESS - Triaxial
stress and fatigue analysis code for pulleys [link] |
| 1983 |
BELTFLEX predicts failure at Quintette,
Canada [link] |
| 1981 |
Formed Conveyor Dynamics,
Inc., a Delaware-based corporation |
| 1980 |
Minera Carbonifera Rio Escondido (M.I.C.A.R.E.)
9 km overland with head/tail drive - our first dynamic
analysis application - Sonora, Mexico |
| 1980 |
BELTFLEX - dynamic
analysis code with 2-D wave equation [link] |
| 1977 |
PSHAFT - pulley shell, disk and shaft
stress analysis code |
| 1976 |
First inverter installation
for belt conveyors (multiplexed) - La Caridad, Mexico |
| 1975 |
Load sharing equations for multiple-driven
pulleys |
| 1967 |
Initial development
of BELTSTAT Architecture Version 1 based on 1966 CEMA
handbook |